Your facility demands reliable operation and high performance levels from your electrical distribution system. The electrical power system experts at Industrial Light and Power can provide you with a comprehensive analysis of your electrical distribution system as well as your real time energy usage using the latest in digital power quality analyzers.

Our professional power distribution technicians can provide you with a complete power quality analysis utilizing the following system parameters:

  • True RMS Voltage (600V max)
  • True RMS current (6500A max)
  • Voltage sag/swell
  • Voltage flicker
  • Active power (Kwh)
  • Reactive power (Kvar)
  • Apparent power (Kva)
  • Power factor
  • Displacement power factor
  • Phase angle
  • THD
  • Frequency
  • Harmonic phase angle
  • Harmonics through the 50th. order
  • Inrush current
  • Transformer K Factor
  • Three phase unbalance
  • Demand
  • Ground resistance
 

Additionally, Industrial Light and Power offers infrared thermal temperature measurements to 1400 degrees F, thermal digital imaging to 662 Degrees F, motor rotation and phase sequence testing, cable and fault locating/mapping, insulation testing to 5000 volts, High voltage readings to 75Kv, underground conduit and wire locating, and long term data logging up to 30 days.

Industrial Light and Power offers two basic commercial power quality analysis packages to meet your needs:

Package A:
Power quality report providing the following detailed measurements:

  • Logging: One sample per second for 30 minutes
  • True RMS voltage up to 600 Volts
  • True RMS current up to 6,500 Amps
  • Power line frequency
  • Apparent power KVA
  • Power factor
  • Ground electrode system inspection
 

Package B:
Power quality report providing the following detailed measurements in addition to everything included in package A:

  • Logging: one sample per second for 60 minutes
  • Voltage sag/swell
  • Voltage flicker
  • Active power (Kwh)
  • Reactive power (Kvar)
  • Displacement power factor
  • THD
  • Harmonics to 50th. order
  • Harmonic phase angle
  • Phase unbalance (3 phase systems only)
  • Ground resistance
 

Longer data logging times for either package are available, up to 30 days maximum, at an additional fee.